Flood Alleviation
Grimshaws were recently contacted by a previous tennis court customer to help solve flooding problems.
Following changes upstream in water management, a previously dry stream bed had become awash and eroded 5ft deeper. This then threatened the stability of the garden and the existing tennis court.
Grimshaw reconstructed the bed and then used a system of gabions to stabilise the area.
Access was via a neighbours field so work was timed to fall inbetween the harvest of one crop and the sowing of the next.
Related articles
- New Tennis Court Quotations (grimshawconstruction.co.uk)
- Grimshaws Bridge Building and Levelling the Land (grimshawconstruction.co.uk)
October 17, 2011 | Posted by Kerry 
Categories:
Tags: